• launching September 2008
launching September 2008

launching September 2008

With new rules for Oiltanker (L>150m) coming into force April 1st 2006, also the classification for the successful design of the "19800tdw" Oil chemical tanker had to be passed again. Extensive FEM calculations considering CSR load assumptions and load cases brought some radical changes in steel construction for this vessel.

Length over all 164,34 m Deadweight all told 19650 t
Length between p. 154,97 m Cargo tank capacity 23340 m³
Breadth moulded 23,00 m Main engine power 7860 kW
Depth to maindeck 12,80 m Speed at design draught 15,50 kn
Draught moulded 9,55 m

Technical Details

« back